What three electrical sources can be used to start the APU?

Study for the ERJ-145 Electrical Test. Gain knowledge with quizzes featuring flashcards and multiple choice questions, complete with hints and explanations. Prepare confidently for your exam!

Multiple Choice

What three electrical sources can be used to start the APU?

Explanation:
The APU needs a DC power source to drive its start motor, so on the ERJ-145 you can energize the APU start from three possible sources. First, a Ground Power Unit (GPU) provides immediate external DC power on the ground, which is the most common way to start the APU when the aircraft is on a stand. If no GPU is available, the APU can be started from onboard power using Battery 2. In some situations Battery 2 alone isn’t enough, so the start sequence can be assisted by the main generators, meaning Battery 2 plus the generators together provide the necessary current to turn the APU start motor. This combination covers the typical ground-start options: GPU, Battery 2, or Battery 2 with assistance from the main generators. Battery 1 is not the designated source for starting the APU on this aircraft, and the SHED Bus isn’t used as a primary source for APU start in standard ops.

The APU needs a DC power source to drive its start motor, so on the ERJ-145 you can energize the APU start from three possible sources. First, a Ground Power Unit (GPU) provides immediate external DC power on the ground, which is the most common way to start the APU when the aircraft is on a stand. If no GPU is available, the APU can be started from onboard power using Battery 2. In some situations Battery 2 alone isn’t enough, so the start sequence can be assisted by the main generators, meaning Battery 2 plus the generators together provide the necessary current to turn the APU start motor. This combination covers the typical ground-start options: GPU, Battery 2, or Battery 2 with assistance from the main generators.

Battery 1 is not the designated source for starting the APU on this aircraft, and the SHED Bus isn’t used as a primary source for APU start in standard ops.